๐ฏ Goal: Ensure the system is stable, scalable, and production-ready before launching.
๐งฑ I. CODE & FUNCTIONAL
- Code reviewed and approved by at least one senior developer
- Unit test coverage โฅ 80%
- Edge cases handled properly
- No N+1 queries (GraphQL/ORM optimized)
- No leftover
console.logordebuggerin code - No secrets or tokens hardcoded
๐ฆ II. CI/CD & DEPLOYMENT
- CI pipeline set up (build โ test โ deploy)
- Rollback plan in place (script or quick revert strategy)
- Staging/UAT environment available and tested
-
.envvariables configured correctly (not copied from local) - Proper branch/tag naming (e.g.
release/v1.0.0)
๐ III. SECURITY
- Auth applied on all sensitive routes (JWT, OAuth, API keys)
- Role & permission system tested
- No publicly exposed sensitive endpoints (
/admin,/debug) - Checked for XSS, SQLi, path traversal vulnerabilities
- Rate limiting/throttling in place for public APIs
- Security headers enabled (
helmet, CORS, etc.)
๐ IV. PERFORMANCE & SCALING
- Load tested for target RPS (e.g. โฅ 10k req/s)
- Concurrent users simulated (e.g. 1k logins)
- DB indexed properly (
EXPLAIN ANALYZEused) - Redis, CDN, or in-memory caching applied
- File/media offloaded to external storage (e.g. S3)
- API only returns necessary data (REST/GraphQL select)
๐ง V. MONITORING & ALERTING
- Logging integrated (Winston, Pino, ELK, Datadog, etc.)
- Logs include traceId, userId, route context
- Metrics collection: Prometheus / Grafana / OpenTelemetry
- Alert configured for:
- High error rate (5xx)
- CPU > 80%
- Memory full
- Queue backlog increasing
โ๏ธ VI. INFRASTRUCTURE
- Load balancer configured and stable
- Auto-restart and healthcheck ready (PM2, Docker, k8s readiness)
- Database backup and restore tested
- Horizontal scaling/pod autoscaling set up if using k8s
-
.env.productionencrypted or managed via Vault
๐ VII. OTHER
- Changelog written (
CHANGELOG.md) - Release announcement sent to relevant teams
- Post-deploy checklist created (Smoke test UI/API)
- QA checklist completed (login, checkout, error, etc.)
- Graceful fallback UI for error handling
-
/status,/health,/metrics,/versionendpoints ready
โ READY TO GO LIVE?
| Goal | Ready? |
|---|---|
| Code clean and stable | โ |
| Load test passed | โ |
| Monitoring in place | โ |
| Rollback plan confirmed | โ |
| Stakeholders notified | โ |
๐ POST GO-LIVE ACTIONS
- Real-time system monitoring active
- User feedback monitored
- Latency/error rate observed
- 24h go-live report or postmortem (if needed)